Enquiries often arrive as one line: “Price for a 1000 ton servo screw press?” Tonnage is a starting point, but a screw press is sized by energy and duty, and a line is priced by scope. Enquiries that turn into workable projects carry more information. Here is what helps.
The part, not just the material. A drawing — even a sketch with the critical dimensions — together with alloy, billet size and forging temperature lets the forming work be estimated. Two parts needing the same peak force can require very different blow energy, and energy is what sizes a screw press.
The quantity. Pieces per hour, pieces per year, and the number of shifts behind those numbers. A press for one shift of moderate volume is specified differently from a line running two shifts flat out.
The current process. What runs the part today — hammer, friction press, hydraulic press — plus the defects that triggered the enquiry. Moving to a servo screw press from a friction press is a different project from starting a new part family (public site material on both paths).
The site constraints. Available power, crane capacity, foundation situation and floor space decide whether the enquiry is for one press or a whole layout. Utilities disclosed early prevent a proposal that cannot be installed.
The quality target. Tolerances that matter, flash allowance and the scrap rate today. These set how much process control the application needs.
The automation expectation. Whether the press will run manual, with a robot, or in a full line with walking beam and spray devices. Automation scope changes the press specification and the layout together (public site material on forging automation).
The acceptance criteria. How the press will be proven at delivery — trial part, production run, energy check. Agreeing this early makes the handover unambiguous.
An enquiry built around these points gets answers in one round instead of four, and the quotation that comes back describes equipment that will actually run the part.
References